Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hueman domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/enginily/public_html/wp-includes/functions.php on line 6131

Warning: Cannot modify header information - headers already sent by (output started at /home2/enginily/public_html/wp-includes/functions.php:6131) in /home2/enginily/public_html/wp-includes/feed-rss2.php on line 8
flat concrete finishing – Engindaily https://engindaily.com Mon, 22 Nov 2021 15:53:31 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://engindaily.com/wp-content/uploads/2021/07/cropped-cropped-engineering-daily-32x32.png flat concrete finishing – Engindaily https://engindaily.com 32 32 Decorative and Flat Concrete Finishing of Your Paths https://engindaily.com/decorative-and-flat-concrete-finishing-of-your-paths/ https://engindaily.com/decorative-and-flat-concrete-finishing-of-your-paths/#comments Mon, 22 Nov 2021 15:53:28 +0000 https://engindaily.com/?p=2690

Good concrete starts with a sturdy base, and that applies to a concrete walkway as much as it does a concrete foundation. On level ground, pouring a new walkway is straightforward, but on sloping ground it may take a slightly different technique.

Once I’ve removed the topsoil and confirmed the remaining soil is free-draining and well compacted, I mark the location of the walk on the house and use these marks to place 18-in. stakes that support the 2×4 formboards. At the opposite end of the walk, I spread the forms to the correct width and attach a formboard for the end of the walk. Then I pull diagonal measurements to square the corners and use a level to slope the walk away from the house 1⁄4 in. per ft. Once everything is square, I drive in the rest of the form stakes and attach the formboards with 2-in. screws.

As I’m pouring the walk, I lift the reinforcing mesh and rebar into the middle of the concrete and screed the concrete flush with the top of the forms. Then I use a bull float to smooth the surface and force the aggregate down into the concrete. Bull-floating brings up bleed water that must evaporate before finishing can continue. When the bleed water is gone and a footprint leaves a 1⁄4-in. impression in the surface, it’s time to start finishing with a magnesium float. The mag float brings up a layer of water and cement particles known as cream. Once there’s a nice layer of cream, the edges can be rounded with an edge tool, and the control joints can be made with a groover.

After a pass or two with a steel finishing trowel, the walk can be finished with a stiff bristle broom pulled across its width. Rinse off the bristles with every pass for distinct ridges that provide maximum traction.

#1

#2

#3

#4

#5

#6

#7

#8

#9

#10

#11

#12

#13

#14

#15

#16

Article Image
Make cream with a mag float
]]>
https://engindaily.com/decorative-and-flat-concrete-finishing-of-your-paths/feed/ 1 2690